AM-WTP Raw Water Pump Station Generator

Location Albany, OR (map)
Zone Zone 3 - North of Lane County
Bid Date 02/21/2023 2:30 pm
Prebid Date 02/02/2023 10:00 am
Mandatory

Description

The Albany-Millersburg Water Treatment Plant intake site currently does not have standby power provisions to continue operations in the event of a power outage. This site experiences frequent power outages which significantly reduces the plant’s ability to produce water. This project provides for installation of a 600 KW generator, transfer switch, and related equipment that will provide backup power for running a single pump at the intake facility. Installation of the generator and...

Join now to read more

Login     Benefits of Membership     Join Now

Want to see more? Login or join now to access these features:

  • Bid and Pre-Bid Dates
  • Bid Results
  • Daily Email Notifications
  • Latest Updates
  • Planholder Listings
  • Project Archives
  • Project File Downloads
  • Project Listings
  • Search by Project Name, City, Zone or Division
  • Watch Lists

We will continue adding new features in the future, and always welcome member feedback.