POM Farm 4 - 2023 Expansion Project - Monitoring Well Installation
Location | Boardman, OR (map) |
Zone | Zone 5 - East of the Cascades |
Bid Date | 02/09/2023 2:00 pm |
Description
Work consists of: Drilling, constructing, and developing two (up to three) six-inch diameter wells with 4-inch pre-packed screens. This project is subject to ORS 279C.800 to 279C.870 (BOLI Prevailing Wage Rates). The PORT OF MORROW will award the contract within thirty (30) calendar days of the bid opening. Contractor shall include an estimated start date with the Bid Schedule. The contractor shall complete all work required in the contract by April 28, 2023.Join now to read more
Login
Benefits of Membership
Join Now
Want to see more? Login or join now to access these features:
- Bid and Pre-Bid Dates
- Bid Results
- Daily Email Notifications
- Latest Updates
- Planholder Listings
- Project Archives
- Project File Downloads
- Project Listings
- Search by Project Name, City, Zone or Division
- Watch Lists
We will continue adding new features in the future, and always welcome member feedback.