POM Farm 4 - 2023 Expansion Project - Monitoring Well Installation

Location Boardman, OR (map)
Zone Zone 5 - East of the Cascades
Bid Date 02/09/2023 2:00 pm

Description

Work consists of: Drilling, constructing, and developing two (up to three) six-inch diameter wells with 4-inch pre-packed screens. This project is subject to ORS 279C.800 to 279C.870 (BOLI Prevailing Wage Rates). The PORT OF MORROW will award the contract within thirty (30) calendar days of the bid opening. Contractor shall include an estimated start date with the Bid Schedule. The contractor shall complete all work required in the contract by April 28, 2023.

Join now to read more

Login     Benefits of Membership     Join Now

Want to see more? Login or join now to access these features:

  • Bid and Pre-Bid Dates
  • Bid Results
  • Daily Email Notifications
  • Latest Updates
  • Planholder Listings
  • Project Archives
  • Project File Downloads
  • Project Listings
  • Search by Project Name, City, Zone or Division
  • Watch Lists

We will continue adding new features in the future, and always welcome member feedback.