Oak Street and Pearl Street Paving

Location Eugene, OR (map)
Zone Zone 2 - Lane County
Bid Date 06/06/2023 2:00 pm

Description

The scope of work for this contract includes: Cold plane removal of existing asphalt surface on Oak St from 13th Ave to 7th Ave; Concrete panel replacement from on Oak St from 17th Ave to 13th Ave; Cold plane removal of existing asphalt surface on Pearl St from 17th Ave to East Broadway; Concrete intersection replacement of Oak St and 15th Ave; Storm water structure modifications and stormwater pipe installation; Temporary and permanent pedestrian and traffic control.

Join now to read more

Login     Benefits of Membership     Join Now

Want to see more? Login or join now to access these features:

  • Bid and Pre-Bid Dates
  • Bid Results
  • Daily Email Notifications
  • Latest Updates
  • Planholder Listings
  • Project Archives
  • Project File Downloads
  • Project Listings
  • Search by Project Name, City, Zone or Division
  • Watch Lists

We will continue adding new features in the future, and always welcome member feedback.