Water Treatment Facility Wetwell and Sedimentation Basin Cleanout |
Albany |
General Contractor for Alsea School CTE Building |
Alsea |
Amity SD Amity High School & Middle School Addition and Remodel |
Amity |
OR66 at Washington St Pedestrian Crossing with ADA ramps |
Ashland |
Astoria District 1 Office HVAC Replacement |
Astoria |
Knappa School District Bond Project - BP #2 |
Astoria |
Water Storage Tank & Pump Station Improvements |
Aumsville |
Aurora Fire District Site Development Project |
Aurora |
Aurora State Airport Surface Seal Project |
Aurora |
Maverik #722 - Baker City |
Baker City |
Sprague Community Theater Re-Siding |
Bandon |
North Transmission Line Intertie Project - CM/GC Contractor |
Beaverton |
Peterkort Rock Gym Phase 2 |
Beaverton |
Tenant Improvements to the Beaverton Building for a Nonprofit Incubator |
Beaverton |
Costco Car Wash |
Bend |
Costco New Warehouse-MDO & Fuel Facility |
Bend |
Gateway North Site Development |
Bend |
Knott Landfill Cell 9 Construction Project |
Bend |
Little Fawn Park Re-Issue |
Bend |
TID Group 4 Piping Project |
Bend |
Captains Quarters Motel Remodel |
Brookings |
EOYCF Walk-in Chiller & Freezer Replacement |
Burns |
Central Point SD CHS Fencing Improvements |
Central Point |
Gold Hill Regional Sewer Intertie - Engineering Design |
Central Point |
Chiloquin Elementary School Seismic Rehabilitation - Engineering Services |
Chiloquin |
Chiloquin Mercantile Building Debris Pile Removal |
Chiloquin |
Clackamas River Water Invitation to Bid - SYSOPS Shop Remodel |
Clackamas |
ESB Vinyl Strip Shop Doors Installation |
Clackamas & Hood River Counties |
Stone Creek Golf Club Pond Repair |
Clackamas County |
ODOT US26: Little Humbug Creek Bridge |
Clatsop County |
Port of Columbia County New Maintenance Facility Project |
Columbia City |
US30 Clatskanie River Bridge Project (Scour Protection Installation) |
Columbia County |
Gilliam County Courthouse Alterations 2024 |
Condon |
CBNB Water Board WTP Reroof |
Coos Bay |
OR241: Chandler (Coos River) Bridge Operators House Project |
Coos County |
794 N. Birch - ADA Ramp |
Coquille |
Latourell Falls Trail Restoration Project |
Corbett |
Cape Blanco Runway and Electrical Rehabilitation (Re-bid) |
Curry County |
US101: MP304.05 Landslide Mitigation Project |
Curry County |
Trench Bore - Highway 30 |
Deer Island |
Engineering Consulting Services Tumalo Reservoir Rd: O.B. Riley Rd to Sisemore Rd |
Deschutes County |
City Hall Demolition - City of Drain |
Drain |
Dufur K-12 School Seismic Rehabilitation - CM/GC Services |
Dufur |
Estacada Urban Renewal Agency - Main Street Improvements |
Estacada |
Lane ESD Technology Office Remodel |
Eugene |
Armitage Park Maintenance Shop |
Eugene |
CM/GC Services for Lane Community College |
Eugene |
Eugene City Hall Remodel |
Eugene |
EWEB Control House for Danebo Substation |
Eugene |
EWEB Tubular Steel Pole Structures |
Eugene |
Geotechnical and Environmental Consulting Services Qualified Pool |
Eugene |
Goodpasture Island Road Over Delta Highway Bridge Repairs |
Eugene |
Lane Events Center Wheeler Pavilion Restroom Improvements |
Eugene |
UO Knight Library Elevator 5 |
Eugene |
W 8th Avenue Paving |
Eugene |
Reynolds SD Design-Build |
Fairview |
Hazel Sills Park - Universally Accessible (UA) Inclusive Playground Replacement |
Forest Grove |
ODOT OR206: Rock Creek Bridge |
Gilliam County |
Fred Meyer #126 - Grants Pass |
Grants Pass |
GPLEX Modular Addition Project 2023 |
Grants Pass |
Portland Loo Installation - Baker Park Boating Facility |
Grants Pass |
Right-Of-Way (ROW) Landscape Maintenance Services |
Grants Pass |
City of Gresham Safety Project |
Gresham |
Kid's Empire Shell |
Gresham |
Multnomah County East County Library - BP #3 |
Gresham |
Central Linn High School CTE Building |
Halsey |
Sewer Line Sand-Debris Removal and Inspection Fort Stevens State Park South Campground |
Hammond |
Hermiston SD 8R - Boiler Replacements |
Hermiston |
S.E. 9th Street (E. Penney Ave. to Feedville Rd.) - 2024 |
Hermiston |
Architectural and Engineering Design Services for the Hillsboro Police Headquarters |
Hillsboro |
Dicks Hillsboro Hyundai |
Hillsboro |
Rock Creek Chemical Building Roof Replacement |
Hillsboro |
Waterfront Storm Line Relocations Phase 2 |
Hood River |
ESB Huntington Sand Shed Fencing Project |
Huntington |
ODOT Jackson County Curb Ramps, Phase 2A |
Jackson County |
ODOT Southern Oregon Seismic Slopes Stability |
Jackson County |
ESB Jordan Valley Tree Removal and Tree Planting Project |
Jordan Valley |
OIT New Geothermal Storage Tank |
Klamath County |
2023 Drainage Canal Maintenance Construction Services |
Klamath Falls |
Maoyina Heights Water Transmission Main |
Klamath Falls |
OIT CEET Boardroom - Video, Sound, and Lighting Consultation |
Klamath Falls |
Seismic Rehabilitation of Klamath County Fire District 4 - Engineering Services |
Klamath Falls |
Aircraft Fuel System and Miscellaneous Electrical Improvements |
La Grande |
EOU Inlow Hall BP All Remaining Scopes |
La Grande |
ESB La Grande Fencing, Gates, and Excavation Phase 2 |
La Grande |
Water and Wastewater System Improvements - 2023 |
La Grande |
New 1 MG Reservoir Project |
Lafayette |
Engineering Services for Pathways Program Group 2 |
Lake Oswego |
Lake Oswego SD Middle School Replacement |
Lake Oswego |
Lake Oswego SD Temporary Traffic Signalization for Uplands Elementary School |
Lake Oswego |
ODOT OR126B at 54th St. (Springfield) |
Lane County |
EWEB Runner Removal |
Leaburg |
Decommissioned Water Treatment Plan Site Rehabilitation Project |
Lebanon |
2023 Asphalt Repair Package |
Lincoln City |
Siletz Health Care |
Lincoln City |
Newport Annex Building Roof Insulation Replacement |
Lincoln County |
Reservoir and Pipeline Improvements Project |
Lyons |
Jefferson County SD Madras & Buff Elementary School Improvements |
Madras |
NUID 43-Lateral Segment 1 Piping Project |
Madras |
NUID Group 1, Segment 1 Pipe Procurement |
Madras |
ODOT US95: Idaho State Line - McDermitt |
Malheur County |
ESB D3 Manhole Rim Repairs Project |
Marion and Yamhill Counties |
ARPA Brooks - Hopmere Water and Wastewater Improvement Project - CM/GC Services |
Marion County |
North Fork Road Improvements |
Marion County |
Santiam Canyon Parks Recovery Project Design |
Marion County |
Grant Avenue Street Improvement Project |
Maupin |
2023 Delashmutt Arena Roof Replacement |
McMinnville |
Haskins Reservoir Sluice Gate Replacement Project |
McMinnville |
Stratus Village |
McMinnville |
Yamhill County Parks Master Plan |
McMinnville |
Yamhill County Pike Road Bridge Replacement 2023-2024 |
McMinnville |
Happy's Carwash |
Medford |
HD Fowler Medford |
Medford |
Jackson County Courthouse Re Roof |
Medford |
Medford SD Fire Alarm Voice Evacuation System |
Medford |
Medford SD Professional of Record NMHS Gym Seismic Retrofit |
Medford |
Swagelok Phase 3 |
Milwaukie |
Northwest Oregon 2024-27 ADA Curb Ramp Design, Ph I (ODOT Region 2) |
Multiple Locations |
Bus Duct Replacement at Justice Center |
Multnomah County |
Graham Road Bridge Strengthening |
Multnomah County |
I-405 Freemont Bridge ATR Replacement |
Multnomah County |
ODOT US30BY at Bridge Ave East Ramp |
Multnomah County |
Progressive Design-Build Services for Utility Shop Building Project |
Myrtle Creek |
Nehalem Hatchery - Pond Repairs |
Nehelem |
Chehalem Cultural Center |
Newberg |
Server Room HVAC Upgrades |
Newberg |
NOAA MOC-P Facility Painting 2023 |
Newport |
Oakland SD HS and MS Seismic Upgrades - CM/GC Services |
Oakland |
Wastewater SCADA Improvements |
Oakland |
Wolf Mountain Communication Shelters |
Oakridge |
On-Call CBX Drop Construction |
Oregon City |
East End Booster Pump Station Project |
Pendleton |
Design of the New John Day Watershed District Office |
Pendleton |
Pendleton Cottage 2475 and 2543 Siding Replacement Eastern Oregon Training Center (EOTC) |
Pendleton |
2022 Capital Construction Bond Qualifications of General Contractors |
Portland |
73 Foster |
Portland |
Centennial SD Oliver MS Seismic Project - CM/GC Services |
Portland |
Home Forward Killingsworth (HFK) |
Portland |
Jefferson High School - Trade Package #2 |
Portland |
Mt. Scott Community Center Seismic Retrofit & Expansion Project |
Portland |
NE 42nd Ave Bridge Replacement Project |
Portland |
NE 46th Avenue & Bryant Street LID Phase I |
Portland |
NE Cornfoot Rd NE 47th to Alderwood Rd |
Portland |
Oregon Zoo Single User Restroom/Breakroom Remodel |
Portland |
PCC Sylvania Campus Communications Technology Building - CM/GC Services |
Portland |
PIA EGSE Infrastructure Installation - Phase 1 |
Portland |
Portland Veterans Affairs Medical Center Seismic Retrofit and Renovation Project Phase II - Buildings 110 and 111 |
Portland |
PPS FSCP Electrical |
Portland |
PPS Roosevelt HVAC |
Portland |
PSU Stephen Epler Residence (SEH) Window Replacement |
Portland |
Springwater Wetland Enhancement |
Portland |
SW 4th Avenue Improvement Project - Rebid |
Portland |
UO Oregon Acoustical Research Laboratory |
Portland |
UO Portland BP A2.3 - Library & Learning Phase 2 |
Portland |
VR2023-180 Mult CO Elections Bldg Fire Sprinkler |
Portland |
Prineville Resiliency Waterline |
Prineville |
Goble Fencing Improvement |
Rainer |
NeighborImpact Food Distribution Warehouse |
Redmond |
New Solar Photovoltaic System at Deschutes County Fair and Expo Center |
Redmond |
Airport Standby Power Generator |
Roseburg |
Douglas County Emergency Management Renovation & Addition |
Roseburg |
Santiam Correctional Institution Roof Drainage |
Salem |
Commercial St Oxford St SE to Madrona Ave SE (Salem) |
Salem |
Employment Building Select Systems Upgrades (Re-Solicitation) |
Salem |
Physical Plant Electrical Upgrades |
Salem |
SAIF Fire Sprinkler, Standpipes, and Fire Hydrant Testing |
Salem |
SAMTD Facilities Camera Project |
Salem |
Trench-Bore Elder - Firridge - Gilkison |
Scappoose |
Seaside SD Broadway Softball Field Improvements - CM/GC Services |
Seaside |
Sherwood Hwy 99W Pedestrian Bridge Project (234ST) |
Sherwood |
Sisters-Camp Sherman Fire District Various Trade Services |
Sisters |
OSP Springfield HVAC Maintenance Service & Repairs |
Springfield |
ODOT City of Springfield Signal Enhancements (Local Roads) |
Springfield |
SUB Glenwood Substation Steel Structures |
Springfield |
West 'D' Street Bike Improvements Project |
Springfield |
Seismic Rehabilitation of FIre Station #1 and the Police Station - Architectural, Engineering and Construction Management Services |
Sutherlin |
Seismic Retrofit of the Existing Oak Heights Elementary School - CM/GC Services |
Sweet Home |
Sweet Home Fire District: Station 22 Seismic Retrofit BP #1 |
Sweet Home |
Durham Solids Freight Elevator Modernization |
Tigard |
Bridge Rail Retrofit Repair Necarney Creek Hwy 9 (Sam Reed) |
Tillamook County |
ODOT Dick Creek Bridge (Bayocean Rd) Tillamook |
Tillamook County |
City of Toledo PSF - Roofing and Siding Replacement Project |
Toledo |
Tualatin River Greenway Trail Extension |
Tualatin |
TownPlace Suites by Marriott - Tumwater, WA |
Tumwater WA |
ODOT Pendleton Signal Upgrade Project Phase II |
Umatilla County |
ODOT Eastern Oregon Roadside Traffic & Weather Cameras |
Various Counties |
2023 Warm Springs Forestry Herbicide Application-Site Prep |
Warm Springs |
Main Avenue at 9th Street Safe Routes to School Project |
Warrenton |
Warrenton RH Primary Care & Cardiac Clinic |
Warrenton |
Warrenton RH Rehab Clinic |
Warrenton |
Harkins House Roof Replacement Project |
Washington County |
HVAC Maintenance Services |
Washington County |
Law Enforcement Center Staff Cafeteria Remodel |
Washington County |
ODOT Washington County Safety, Bike and Pedestrian Improvements |
Washington County |
Overhead Door, Sally Port Door, and Automatic Gate Installation, Repair and Maintenance Services |
Washington County |
Washington County Cooperative Library Services Tenant Improvement Project |
Washington County |
CMGC Services for Administrative Main Fire Station |
Welches |
2024 Safe Routes to School Engineering Design Services |
West Linn |
West Linn-Wilsonville SD Landscape Services - West Linn |
West Linn |
Charbonneau Lift Station Rehabilitation RFQ/SOQ |
Wilsonville |
West Linn-Wilsonville SD Landscape Services - District Central |
Wilsonville |
West Linn-Wilsonville SD Landscape Services - Wilsonville-North |
Wilsonville |
West Linn-Wilsonville SD Landscape Services - Wilsonville-South |
Wilsonville |
GYoung Water Treatment System and Service Line |
Winston |
R2 Paving RFB - OR214 (140) MP37.5-MP38.2 Paving (Woodburn) |
Woodburn |