PIA Basin 6 Regional Stormwater Facility Expansion
Location | Portland, OR (map) |
Zone | Zone 3 - North of Lane County |
Bid Date | 11/28/2023 2:00 pm |
Prebid Date | 11/08/2023 3:00 pm |
Description
Sediment removal and disposal from the East Quiescent Basin (EQB) and East Detention Basin (EDB); construction of a steel sheet pile stormwater wall with outfall pipes, sluice gates, flow water monitoring assemblies, and contractor-designed pedestrian walkways; providing a gravel access road to the EDB; providing bird netting to cover the upper EDB; and connecting into an existing supervisory control and data acquisition (SCADA) stormwater system for gate controls and monitoring.Join now to read more
Login
Benefits of Membership
Join Now
Want to see more? Login or join now to access these features:
- Bid and Pre-Bid Dates
- Bid Results
- Daily Email Notifications
- Latest Updates
- Planholder Listings
- Project Archives
- Project File Downloads
- Project Listings
- Search by Project Name, City, Zone or Division
- Watch Lists
We will continue adding new features in the future, and always welcome member feedback.