NW Despain Avenue Reconstruction Project
Location | Pendleton, OR (map) |
Zone | Zone 5 - East of the Cascades |
Bid Date | 04/25/2024 2:00 pm |
Description
Work to be performed under this contract shall include the removal and replacement of approximately 2,670 LF of City standard curb and gutter, 559 SY of sidewalk and driveway approaches, 1,200 tons of asphalt, 2,160 LF of water main, 780 LF of storm drain pipe, catch basins, manholes, and other associated work. The HMAC for this Project shall be 1/2-inch Dense Level 3 with PG 64-28 grade oil. HMAC shall be placed in 2 – 2-inch lifts for reconstructions.Join now to read more
Login
Benefits of Membership
Join Now
Want to see more? Login or join now to access these features:
- Bid and Pre-Bid Dates
- Bid Results
- Daily Email Notifications
- Latest Updates
- Planholder Listings
- Project Archives
- Project File Downloads
- Project Listings
- Search by Project Name, City, Zone or Division
- Watch Lists
We will continue adding new features in the future, and always welcome member feedback.