Farm 4 Pipe Installation
Location | Boardman, OR (map) |
Zone | Zone 5 - East of the Cascades |
Bid Date | 06/06/2023 2:00 pm |
Prebid Date | 05/25/2023 10:00 am |
Description
Supply of labor, equipment, and miscellaneous materials. The project consists of the installation of approximately 38,447 feet of farm pipe, valves and fittings per spec and details. Bidder to include concrete materials for thrust blocks all other materials provided by owner. Field testing shall be the responsibility of the bidder. Manifolds installed by owner; bidder is required to make all connections to manifold. This is a PORT OF MORROW Public Works Project. Bidders must be as specified in...Join now to read more
Login
Benefits of Membership
Join Now
Want to see more? Login or join now to access these features:
- Bid and Pre-Bid Dates
- Bid Results
- Daily Email Notifications
- Latest Updates
- Planholder Listings
- Project Archives
- Project File Downloads
- Project Listings
- Search by Project Name, City, Zone or Division
- Watch Lists
We will continue adding new features in the future, and always welcome member feedback.